Attaching a cable grip

Attaching a cable grip

Nicolas C. Michel-Hart (APL Principal Engineer) attaches a "Yale" cable grip to the Offshore Deep Profiler Mooring cable for recovery. Tim M. McGinnis (APL Sr. Principal Engineer) and Trina M. Litchendorf (APL Oceanographer IV) assist. Credit: M. Elend, University of Washington, V18.

Related Stories