Dive Highlights J1044 Slope Base

Loading the player...

During Jason Dive J2-1044, the Platform Interface Assembly at Slope Base was installed and the Shallow Profiler Mooring was recovered. Credit: UW/OOI-NSF/WHOI; V18.

  

Related Stories