During ROPOS fdive R1833, the Platform Controller System (PC03A-2015) was installed on the 200 m platform and the Science Pod (SP03A-2014) was recovered. The dive went very smoothly with operations in water taking 1.5 hours. Credit: NSF-OOI/UW/ISS; Dive R1833; V15.
Related Stories