R1727 Highlights Central Caldera Completed

Loading the player...

RS03W9 Installed from Primary Node PN3B to the Central Caldera Site Installed  - Completed Central Caldera Site: The 4.6 km cable, RS03W9, was successfully installed from PN3B to the Central Caldera Site. The medium powered junction box MJ03f was connected as was the bottom pressure-tilt instrument (BOTPTA301). The broadband seismometer (OBSSBA301) was installed and connected, as was the the low frequency hydrophone (HYDFA305). Video Credit: NSF-OOI/UW/CSSF; Dive R1727; V14. (02:31)

  

Related Stories