R1732 Highlights Axial Base MJ03A Installed

Loading the player...

R1732 Highlights - Axial Base-PN3A: During this dive, the medium-power junction box MJ03A was installed at the Axial Base site and connected to RS03W3 (606 m) that extends to PN3A. The pressure sensor will be connected on the follow-on leg to the J-Box, and the VEL3D instrument deployed. (00:50)

  

Related Stories