Construction
- Node Installations Complete!
- Six on the Seafloor!
- New Segment 7
- Defining the SIA
- PN5A Successfully Deployed!
- PN 5A – Jointing Operations
- PN 5A Installation Continues
- On Site to Install PN5A
- Transit to Node 5A
- Port Call in Portland
- PN1D is Installed!
- Burial and Inspection Completed ...
- Humpbacks Visit
- Cable Burial Node PN1C
- Milestone: PN1C is Installed
- Photos of Final Inspection of P ...
- Another RSN Node is Born!
- Cable Burial Continues at Secon ...
- Second Node Installed!
- Splicing Node PN1B into Segment ...
- Recovering End of Segment 3
- Word for the Day: Persistence
- Major Milestone: First Node Ins ...
- Primary Node 1A Powered Up on D ...
- Recovering and Testing Cable Se ...
- OOI Primary Node Installation B ...
- Cable Installation Update
- Dolphins and Puffins and Molas, ...
- Day 51: Seabed Cable Lay Comple ...
- Dynamic Positioning
- Update on Cable Installation
- Completion of Segment 1 Burial
- Leaps and Bounds at the Shore S ...
- Segment 5 Installation Complete ...
- Laying Segment 5
- Bustling Shore Station
- At-Sea Installation Phases
- Installing the Land Cable
- TE SubCom Dependable Propulsion ...
- Divers at Work
- The Day After
- Second OOI Cable Landed
- Second Cable Landing Reschedule ...
- OOI Open House in Pacific City, ...
- The Cable has Landed!
- Last Grapnel Run Before Landing ...
- Preparing for the Cable Landing ...
- Seaplow 101
- Marine Mammal Observations
- Communicating with a Fishing Ve ...
- Cable Deployment Update
- Off Pacific City, Oregon
- Finished with First Segment
- Deploying Repeaters
- Start of First Cable Segment
- Leaving Astoria
- Meeting the Cable Ship in Astor ...
- Cable Laying Vessel Underway
- Photos of OOI Cable Loading
- Northern conduit installed
- Northern Conduit drilling compl ...
- Bubble test for the Southern Co ...
- Drilling of the Northern Condui ...
- Update on Drilling
July 2013
May 2013
December 2012
October 2012
August 2012
July 2012
April 2012
March 2012
January 2012
October 2011
September 2011
August 2011
July 2011
June 2011
March 2011
February 2011
October 2010
June 2010
May 2010
April 2010
- Visions13
- Visions12
- Visions11
- Enlighten
OOI personnel at the shore station in Pacific City, Oregon, are actively involved in node installation. They are monitoring activities as the system is powered on and off during ship-based tests and deployments. Pete Barletto, OOI RSN Chief Operating Officer, reports from the shore station.
On July 26th at 4 pm PDT, the third Primary Node (PN1C) on the OOI RSN came to life as power was re-applied to the cable system and energized the Node while it sat on deck of the TE SubCom Dependable. The cable segment linking it to the Shore Station at Pacific City (via the first two nodes, PN1A and PN1B) and the cable segment that will link it to the fourth and final node of this string (PN1D) were connected via temporary fiber and power conductor splices. These connections allow testing of this third node and cables so that any issues can be resolved before node deployment.
The photo above shows the screen of an Optical Spectrum Analyzer (OSA) at the Shore Station. The twelve peaks are actually the twelve wavelengths coming from the three RSN Primary Nodes currently connected. Each Node has two traffic wavelengths of 10gb/s each and two wavelengths for system management.
This leg of the RSN Network is also called the Newport Line and will also provide power and bandwidth to the Endurance Array coastal studies component of the OOI.
--Pete Barletto at the OOI-RSN Shore Station in Pacific City, Oregon.