Construction
- Node Installations Complete!
- Six on the Seafloor!
- New Segment 7
- Defining the SIA
- PN5A Successfully Deployed!
- PN 5A – Jointing Operations
- PN 5A Installation Continues
- On Site to Install PN5A
- Transit to Node 5A
- Port Call in Portland
- PN1D is Installed!
- Burial and Inspection Completed ...
- Humpbacks Visit
- Cable Burial Node PN1C
- Milestone: PN1C is Installed
- Photos of Final Inspection of P ...
- Another RSN Node is Born!
- Cable Burial Continues at Secon ...
- Second Node Installed!
- Splicing Node PN1B into Segment ...
- Recovering End of Segment 3
- Word for the Day: Persistence
- Major Milestone: First Node Ins ...
- Primary Node 1A Powered Up on D ...
- Recovering and Testing Cable Se ...
- OOI Primary Node Installation B ...
- Cable Installation Update
- Dolphins and Puffins and Molas, ...
- Day 51: Seabed Cable Lay Comple ...
- Dynamic Positioning
- Update on Cable Installation
- Completion of Segment 1 Burial
- Leaps and Bounds at the Shore S ...
- Segment 5 Installation Complete ...
- Laying Segment 5
- Bustling Shore Station
- At-Sea Installation Phases
- Installing the Land Cable
- TE SubCom Dependable Propulsion ...
- Divers at Work
- The Day After
- Second OOI Cable Landed
- Second Cable Landing Reschedule ...
- OOI Open House in Pacific City, ...
- The Cable has Landed!
- Last Grapnel Run Before Landing ...
- Preparing for the Cable Landing ...
- Seaplow 101
- Marine Mammal Observations
- Communicating with a Fishing Ve ...
- Cable Deployment Update
- Off Pacific City, Oregon
- Finished with First Segment
- Deploying Repeaters
- Start of First Cable Segment
- Leaving Astoria
- Meeting the Cable Ship in Astor ...
- Cable Laying Vessel Underway
- Photos of OOI Cable Loading
- Northern conduit installed
- Northern Conduit drilling compl ...
- Bubble test for the Southern Co ...
- Drilling of the Northern Condui ...
- Update on Drilling
July 2013
May 2013
December 2012
October 2012
August 2012
July 2012
April 2012
March 2012
January 2012
October 2011
September 2011
August 2011
July 2011
June 2011
March 2011
February 2011
October 2010
June 2010
May 2010
April 2010
- Visions13
- Visions12
- Visions11
- Enlighten
At-Sea Installation Phases
Thursday, July 21, 2011
Installation of the OOI at-sea cabled network will take place in phases over the next few years:
1) Summer 2011: The cable ship will deploy the backbone cable in seven separate segments. As the cable laying vessel approaches the end of each respective segment, a grapple line will be attached and deployed for later retrieval at the time of the node installation. Cable segment ends will be sealed.
2) Summer of 2012: A vessel will be mobilized for installation of the primary nodes. The cable ends will be recovered at the location of each primary node, and the nodes will be connected to the backbone cable. The primary function of the backbone cable will be to distribute power and communications from the shore station to subsea primary nodes. The nodes will convert high-power voltage to a lower level and distribute to science ports along with communications and timing signals.
3) 2013: Low-voltage nodes and junction boxes will be connected to primary nodes by extension cables and will provide data and power interface to small groups of scientific instruments. In total, the OOI cabled network will consist of over 100 sensors linked by 60km of extension cables.
4) 2014: Moorings will be installed at Hydrate Ridge and Axial sites.
--Cecile Durand, OOI Maintenance Operations Manager, University of Washington, onboard the TESubCom Dependable