Construction
- Node Installations Complete!
- Six on the Seafloor!
- New Segment 7
- Defining the SIA
- PN5A Successfully Deployed!
- PN 5A – Jointing Operations
- PN 5A Installation Continues
- On Site to Install PN5A
- Transit to Node 5A
- Port Call in Portland
- PN1D is Installed!
- Burial and Inspection Completed ...
- Humpbacks Visit
- Cable Burial Node PN1C
- Milestone: PN1C is Installed
- Photos of Final Inspection of P ...
- Another RSN Node is Born!
- Cable Burial Continues at Secon ...
- Second Node Installed!
- Splicing Node PN1B into Segment ...
- Recovering End of Segment 3
- Word for the Day: Persistence
- Major Milestone: First Node Ins ...
- Primary Node 1A Powered Up on D ...
- Recovering and Testing Cable Se ...
- OOI Primary Node Installation B ...
- Cable Installation Update
- Dolphins and Puffins and Molas, ...
- Day 51: Seabed Cable Lay Comple ...
- Dynamic Positioning
- Update on Cable Installation
- Completion of Segment 1 Burial
- Leaps and Bounds at the Shore S ...
- Segment 5 Installation Complete ...
- Laying Segment 5
- Bustling Shore Station
- At-Sea Installation Phases
- Installing the Land Cable
- TE SubCom Dependable Propulsion ...
- Divers at Work
- The Day After
- Second OOI Cable Landed
- Second Cable Landing Reschedule ...
- OOI Open House in Pacific City, ...
- The Cable has Landed!
- Last Grapnel Run Before Landing ...
- Preparing for the Cable Landing ...
- Seaplow 101
- Marine Mammal Observations
- Communicating with a Fishing Ve ...
- Cable Deployment Update
- Off Pacific City, Oregon
- Finished with First Segment
- Deploying Repeaters
- Start of First Cable Segment
- Leaving Astoria
- Meeting the Cable Ship in Astor ...
- Cable Laying Vessel Underway
- Photos of OOI Cable Loading
- Northern conduit installed
- Northern Conduit drilling compl ...
- Bubble test for the Southern Co ...
- Drilling of the Northern Condui ...
- Update on Drilling
July 2013
May 2013
December 2012
October 2012
August 2012
July 2012
April 2012
March 2012
January 2012
October 2011
September 2011
August 2011
July 2011
June 2011
March 2011
February 2011
October 2010
June 2010
May 2010
April 2010
- Visions13
- Visions12
- Visions11
- Enlighten
Installing the Land Cable
Wednesday, July 20, 2011
Chris Hoyt, University of Washington OOI Field Operations Manager reports on the land cable installation activities at the OOI Shore Station in Pacific City, Oregon:
It's an exciting time in Pacific City, and the shore station is a beehive of activity. Both power cables have been pulled through the manhole-duct system from the beach manhole to the shore station cable vault, and the fiber-optic cable is being pulled through today.
The Power Feed Equipment* installation is in full swing, with three of the seven PFE cabinets bolted down and fastened together. The Uninterruptible Power Suplly** battery cabinet, battery charger, and transformer are mounted to the floor, and three electricians are on-site installing conduit and cabling between the various components that provide input power to the PFE.
The Submarine Line Terminal Equipment*** was delivered yesterday, unpacking began first thing this morning, and the SLTE installation is underway. Duct is now being installed to facilitate the installation of fiber optic cable between the vault and SLTE, and the element management workstation is being set up.
And, of course, it's all proceeding at the speed of light.
----
*The PFE powers all of the undersea nodes and science-gathering devices, as well as the optical line amplifiers on the submarine fiber-optic cables.
**The UPS for the PFE is a large battery power source that ensures continuous operation of the PFE when commercial power is lost and up until the backup diesel generators assume the building load.
***The SLTE consists of Transmission Terminal Equipment with multi-channel transmission capability for transmitting data to and from the undersea observatory nodes, a Line Monitoring System to monitor the health of the fiber optic lines and locate cable faults, and an Element Management System that will be used to monitor optical line performance and amplifier status.