Northern Conduit drilling continues

Monday, March 21, 2011
Installation of the 12 inch casing
Drilling with the 12 inch casing installed

Drilling begins again after the installation of the 12" casing. 

As of last Saturday (3/19), 630 ft of temporary 12" casing has been installed in the northern conduit as part of the pilot hole. This casing is installed (as seen in the image above) into the pilot hole in order to add stability and to prevent it from collapsing. L3-Maripro workers at the site have drilled 1,482 ft of the 5,000 ft horizontal conduit.