- Visions18
- Visions17
- Visions16
- Visions15
- Visions14
-
Construction
- Node Installations Complete!
- Six on the Seafloor!
- New Segment 7
- Defining the SIA
- PN5A Successfully Deployed!
- PN 5A – Jointing Operations
- PN 5A Installation Continues
- On Site to Install PN5A
- Transit to Node 5A
- Port Call in Portland
- PN1D is Installed!
- Burial and Inspection Completed ...
- Humpbacks Visit
- Cable Burial Node PN1C
- Milestone: PN1C is Installed
- Photos of Final Inspection of P ...
- Another RSN Node is Born!
- Cable Burial Continues at Secon ...
- Second Node Installed!
- Splicing Node PN1B into Segment ...
- Recovering End of Segment 3
- Word for the Day: Persistence
- Major Milestone: First Node Ins ...
- Primary Node 1A Powered Up on D ...
- Recovering and Testing Cable Se ...
- OOI Primary Node Installation B ...
- Cable Installation Update
- Dolphins and Puffins and Molas, ...
- Day 51: Seabed Cable Lay Comple ...
- Dynamic Positioning
- Update on Cable Installation
- Completion of Segment 1 Burial
- Leaps and Bounds at the Shore S ...
- Segment 5 Installation Complete ...
- Laying Segment 5
- Bustling Shore Station
- At-Sea Installation Phases
- Installing the Land Cable
- TE SubCom Dependable Propulsion ...
- Divers at Work
- The Day After
- Second OOI Cable Landed
- Second Cable Landing Reschedule ...
- OOI Open House in Pacific City, ...
- The Cable has Landed!
- Last Grapnel Run Before Landing ...
- Preparing for the Cable Landing ...
- Seaplow 101
- Marine Mammal Observations
- Communicating with a Fishing Ve ...
- Cable Deployment Update
- Off Pacific City, Oregon
- Finished with First Segment
- Deploying Repeaters
- Start of First Cable Segment
- Leaving Astoria
- Meeting the Cable Ship in Astor ...
- Cable Laying Vessel Underway
- Photos of OOI Cable Loading
- Northern conduit installed
- Northern Conduit drilling compl ...
- Bubble test for the Southern Co ...
- Drilling of the Northern Condui ...
- Update on Drilling
July 2013
May 2013
December 2012
October 2012
August 2012
July 2012
April 2012
March 2012
January 2012
October 2011
September 2011
August 2011
July 2011
June 2011
March 2011
February 2011
October 2010
June 2010
May 2010
April 2010
- Visions13
- Visions12
- Visions11
- Enlighten
The OOI RSN program has achieved another major milestone! The Mid-Plate Node, Primary Node 5A, was deployed from the deck of the TE SubCom Dependable at 0405h PDT today and landed on the seafloor three hours later. This is the first primary node to be installed on the northern section of the OOI cabled infrastructure, which runs some 480 km from Pacific City, Oregon, out to Axial Seamount on the Juan de Fuca Ridge.
Here's how the deployment proceeded: At 0100h PDT on Saturday, August 11, 2012, we commenced final preparations for the deployment of PN5A. The spare Science Interface Assembly, which had been temporarily installed into the PN5A frame for testing, was transfered to the spare primary node that is carried onboard. PN5A was deployed with minimal internal electronics because of its role as a "placeholder" node that allows for potential future expansion.
At 0400h, PN5A was lifted from the aft deck of the TE SubCom Dependable and entered the water at 0405h. The node landed on the seafloor three hours later at a depth of 2800 meters. The node was successfully tested from the shore station and tilt parameters were verified to confirm that the node is lying flat on the seafloor.
As of 1830h PDT, we are transiting to the Primary Node 3A site, which is located on Axial Seamount approximately 100 nm (185 km) to the west of the just-installed Mid-Plate Node. Our ETA is 2200h PDT.
-- Brian Ittig, OOI RSN Marine Operations Manager, University of Washington, onboard the TE SubCom Dependable