- Visions18
- Visions17
- Visions16
- Visions15
- Visions14
-
Construction
- Node Installations Complete!
- Six on the Seafloor!
- New Segment 7
- Defining the SIA
- PN5A Successfully Deployed!
- PN 5A – Jointing Operations
- PN 5A Installation Continues
- On Site to Install PN5A
- Transit to Node 5A
- Port Call in Portland
- PN1D is Installed!
- Burial and Inspection Completed ...
- Humpbacks Visit
- Cable Burial Node PN1C
- Milestone: PN1C is Installed
- Photos of Final Inspection of P ...
- Another RSN Node is Born!
- Cable Burial Continues at Secon ...
- Second Node Installed!
- Splicing Node PN1B into Segment ...
- Recovering End of Segment 3
- Word for the Day: Persistence
- Major Milestone: First Node Ins ...
- Primary Node 1A Powered Up on D ...
- Recovering and Testing Cable Se ...
- OOI Primary Node Installation B ...
- Cable Installation Update
- Dolphins and Puffins and Molas, ...
- Day 51: Seabed Cable Lay Comple ...
- Dynamic Positioning
- Update on Cable Installation
- Completion of Segment 1 Burial
- Leaps and Bounds at the Shore S ...
- Segment 5 Installation Complete ...
- Laying Segment 5
- Bustling Shore Station
- At-Sea Installation Phases
- Installing the Land Cable
- TE SubCom Dependable Propulsion ...
- Divers at Work
- The Day After
- Second OOI Cable Landed
- Second Cable Landing Reschedule ...
- OOI Open House in Pacific City, ...
- The Cable has Landed!
- Last Grapnel Run Before Landing ...
- Preparing for the Cable Landing ...
- Seaplow 101
- Marine Mammal Observations
- Communicating with a Fishing Ve ...
- Cable Deployment Update
- Off Pacific City, Oregon
- Finished with First Segment
- Deploying Repeaters
- Start of First Cable Segment
- Leaving Astoria
- Meeting the Cable Ship in Astor ...
- Cable Laying Vessel Underway
- Photos of OOI Cable Loading
- Northern conduit installed
- Northern Conduit drilling compl ...
- Bubble test for the Southern Co ...
- Drilling of the Northern Condui ...
- Update on Drilling
July 2013
May 2013
December 2012
October 2012
August 2012
July 2012
April 2012
March 2012
January 2012
October 2011
September 2011
August 2011
July 2011
June 2011
March 2011
February 2011
October 2010
June 2010
May 2010
April 2010
- Visions13
- Visions12
- Visions11
- Enlighten
Related Images and Videos : View All
The horn on the backhoe blasted and someone shouted "The cable has landed!" With that, the southern segment of the OOI cable emerged at the shore end of the conduit pipe at 11:15 am on Tuesday, July 12, in Pacific City, Oregon, and ocean science history was made.
The day had begun several hours earlier at first light of day, tinged by a persistent drizzle and cloaked in low gray clouds. Several of us from the University of Washinton OOI team were there, including our Chief Operating Officer, Pete Barletto, and Associate Director for Operations, Michael Mulvihill. Kerry Beck from the Consortium for Ocean Leadership office in DC and Director of Communications for OOI was also there, happily enduring the rain for the sake of the moment. The occasional beachgoer strolled by and asked what was going on.
From the top of the dune behind the beach manhole where the cable would emerge, we could see the TE SubCom cable ship Dependable sitting about a mile offshore. Divers went into the water and down to the end of the pipe, where they fought currents to attach the end of the undersea cable from the ship to tape that was connected to a 3/8" wire farther up the pipe to the 5/8" wire on a drum on a winch onshore.
Because the ship was so close, we were able to talk and text by cell phone with our colleague, Cecile Durand, OOI Marine Maintenance Manager at the UW, who is on the Dependable for the two months of cable installation work. We kept each other updated about what was happening at our respective ends of the cable, excited that this moment had finally arrived. The TE SubCom shore crew was welcoming and explained the procedures as we watched them monitor the tension on the wire, use the backhoe to adjust the angle of the cable going onto the drum on the winch, and then guide the cable onto the drum.
At about 11 am, the Director of the OOI Regional Cabled Network, John Delaney, arrived in the nick of time from a meeting at Oregon State in Corvallis. Delaney has devoted the past 20 years of his professional life to development of this cabled observatory in the northeast Pacific. We stood and watched the swivel at the end of the undersea cable emerge from the end of the conduit pipe. The horn sounded, and the cable was landed for the first U.S. regional cabled ocean observatory. Although the TE SubCom crew lands cables routinely, for those of us involved with the project it was a thrilling and emotional moment to achieve this milestone.
The second cable, the one for the northern segment that will reach 310 miles offshore to Axial Seamount, is scheduled to be landed on July 14 using the same professional and expert operations on display today by the TE SubCom crew.
--Nancy Penrose, Communications Coordinator, and Allison Fundis, Education and Public Engagement Liaison, University of Washington, on shore in Pacific City, Oregon.