- Visions18
- Visions17
- Visions16
- Visions15
-
Visions14
- End of Leg 7
- Leg 6 gets underway
- Calm before the storm
- Reloading for the next mooring
- Leg 5a: A Blur of Activity at A ...
- VISIONS14 Leg 4 Comes to an End ...
- Fire Hose Of Methane Out of Sou ...
- Work, Weather, and Life in the ...
- Troubleshooting, Weather, and t ...
- How Much Methane Comes Out of T ...
- Imaging Einstein's Grotto
- Success at Oregon Offshore
- Busy Days at Hydrate Ridge and ...
- To Sea We Go
- Leg 4 Hydrate Ridge Adventures
- Shallow Waters
- Standing on Two Legs
- High Waves, Deep Methane
- Endurance Required
- Leg 3 Begins
- The Golden Spike
- The Best Laid Plans
- HPIES and Cake and profilers
- Unexpected sightings
- Axial Base Camp
- Slope to Seamount
- VISIONS 14 Leg 2 Begins
- Steaming In Completed Our Work
- International District Complete ...
- Installation Complete At Intern ...
- Intense Activity on the Thomas ...
- Installing J Boxes and Instrume ...
- Completing the Cable and Juncti ...
- Preparing to Install Cable at 8 ...
- Diving in the International Dis ...
- Weather Day in the NE Pacific
- Steaming to Axial Seamount
- Nearly 25 years of dreaming...
- Loading and Mobilizing in Seatt ...
September 2014
August 2014
July 2014
- Construction
- Visions13
- Visions12
- Visions11
- Enlighten
Today has been spent in preparation for the upcoming dive (Dive R1712) at the summit of Axial Seamount. Safety meetings were held among the ship, ROPOS, and science party teams, operational plans were discussed, and equipment readied for the first dive. The Main Lab continues to be alive with activity in anticipation of the first dive sequence. Students are finalizing their projects and already collecting data and imagery.
We entered the Pacific out of the Straits of Juan de Fuca (Salish Sea) early in the morning, and weather picked up a bit - blowing about 20 knots. However, the seas were not bad, and today at 1600 the ride is very comfortable. Some folks took some quiet time to catch up on sleep after the intense mobilization period, getting tons of gear packed and onto the ship.
We are looking forward to arrving on site and to beginning this final phase of installation.